PR 493 over PR 22

2.9 KM W INT PR22 & P · County 065, Puerto Rico · Built 1980 · 2 Lanes · 10,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
016891
Year Built
1980
Length
67.8 m (222.4 ft)
Max Span
32.6 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
10,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$998,000
Total Project Cost
$1,193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.