PR 2 over UNNAMED CREEK

HATILLO FRENTE MALL · County 065, Puerto Rico · Built 1990 · 7 Lanes · 35,900 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
022011
Year Built
1990
Length
11.1 m (36.4 ft)
Max Span
3.5 m
Width
35.8 m (117.5 ft)
Lanes
7
Daily Traffic
35,900
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$75,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.