8 STREET over CREEK
ALTURAS DE FLAMBOYAN · County 021, Puerto Rico · Built 1956 · 2 Lanes · 700 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.388636, -66.152908
This bridge is in worse condition than 60.8% of bridges in County 021. The average bridge in Puerto Rico is 0 years old; this one is 70 years old.
Nearby Bridges
T.N MRTNZ .52 KM over WATERWAY
Built 1985
PR 5 15.5 KM over SANTA JUANITA CREEK
Built 1986
RAMON RODZ AVENUE over HONDO RIVER
Built 1983
AV NELSON MARTINEZ over DRAINAGE DITCH
Built 1960
PR 2 11.35 KM over PR-5 AND ROAD OVER PR-2
Built 1998
PR 2 over HONDO RIVER
Built 1942
ISABEL SEGUNDA ST over HONDO RIVER
Built 1994
PR 5 over Los Millones Ave
Built 2008
PR-5 KM 5.70 over Los Millones Ave.
Built 2009
Los Millones Ave. over Santa Juanita Creek
Built 2008
Bridge Details
- Structure #
- 021701
- Year Built
- 1956
- Length
- 16.8 m (55.1 ft)
- Max Span
- 5.7 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 700
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $344,000
- Total Project Cost
- $413,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.