PR 2 over HONDO RIVER
0.5 KM BAYAMON DOWNTOWN · County 021, Puerto Rico · Built 1942 · 4 Lanes · 39,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
18.396025, -66.1557
This bridge is in worse condition than 60.8% of bridges in County 021. The average bridge in Puerto Rico is 0 years old; this one is 84 years old.
Nearby Bridges
ISABEL SEGUNDA ST over HONDO RIVER
Built 1994
PR 2 11.35 KM over PR-5 AND ROAD OVER PR-2
Built 1998
RAMON RODZ AVENUE over HONDO RIVER
Built 1983
PR 855 over HONDO RIVER
Built 1976
BETANCES STREET over HONDO RIVER
Built 1976
PR 2 1.1 KM over HONDO RIVER
Built 1981
PR 5 over RAMON RODRIGUEZ AVENUE
Built 2000
PR 855 0.7 KM over SANTA CATALINA CREEK
Built 1980
PR 890 0.4 KM over HONDO RIVER
Built 1968
PR 8858 0.80 KM over HONDO RIVER
Built 1996
Bridge Details
- Structure #
- 000341
- Year Built
- 1942
- Length
- 19.7 m (64.6 ft)
- Max Span
- 17 m
- Width
- 20.3 m (66.6 ft)
- Lanes
- 4
- Daily Traffic
- 39,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $780,000
- Total Project Cost
- $936,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.