PR 2 11.35 KM over PR-5 AND ROAD OVER PR-2
0.4 KM EAST OF BAYAMON · County 021, Puerto Rico · Built 1998 · 4 Lanes · 31,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.395833, -66.153611
This bridge is in worse condition than 26.6% of bridges in County 021. The average bridge in Puerto Rico is 0 years old; this one is 28 years old.
Nearby Bridges
PR 2 over HONDO RIVER
Built 1942
RAMON RODZ AVENUE over HONDO RIVER
Built 1983
ISABEL SEGUNDA ST over HONDO RIVER
Built 1994
PR 855 over HONDO RIVER
Built 1976
PR 2 1.1 KM over HONDO RIVER
Built 1981
BETANCES STREET over HONDO RIVER
Built 1976
PR 5 over RAMON RODRIGUEZ AVENUE
Built 2000
RAMP PR 29 TO PR 5 over WATERWAY
Built 1996
PR 5 over WATERWAY
Built 1996
PR 890 0.4 KM over HONDO RIVER
Built 1968
Bridge Details
- Structure #
- 024311
- Year Built
- 1998
- Length
- 136.6 m (448.2 ft)
- Max Span
- 25.7 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 4
- Daily Traffic
- 31,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.