PR 52 SOUTHBOUND over PR 1
2 KMS EAST OF PONCE · County 113, Puerto Rico · Built 1990 · 3 Lanes · 25,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
18.005953, -66.58105
This bridge is in worse condition than 61.3% of bridges in County 113. The average bridge in Puerto Rico is 0 years old; this one is 36 years old.
Nearby Bridges
PR 52 NORTHBOUND over PR 1
Built 1990
PR 52 NORTHBOUND over LOCAL ROAD
Built 1995
PR 52 SOUTHBOUND over LOCAL ROAD
Built 1995
PR 1 KM 125.0 over BUCANA RIVER
Built 1975
PR 10 0.5 KM over WATERWAY
Built 1997
PR 52 NOBD 98.9 KM over DIRT ROAD
Built 1971
PR 52 SOUTHBOUND over DIRT ROAD
Built 1971
PR 52 102.3 KM over DIRT ROAD
Built 1995
PR 2 over PORTUGUES RIVER
Built 1978
PR 12 4.5 KM over PR 1 AND PR 133 126.8 KM
Built 1996
Bridge Details
- Structure #
- 019412
- Year Built
- 1990
- Length
- 57 m (187 ft)
- Max Span
- 29.1 m
- Width
- 16.4 m (53.8 ft)
- Lanes
- 3
- Daily Traffic
- 25,400
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,493,000
- Total Project Cost
- $1,866,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.