PR 52 SOUTHBOUND over DIRT ROAD
1.1 KM NORTHEAST INT PR 1 · County 113, Puerto Rico · Built 1971 · 2 Lanes · 32,200 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.021811, -66.576431
This bridge is in worse condition than 61.3% of bridges in County 113. The average bridge in Puerto Rico is 0 years old; this one is 55 years old.
Nearby Bridges
PR 52 NOBD 98.9 KM over DIRT ROAD
Built 1971
PR 52 NORTHBOUND over PR 10
Built 1971
PR 52 SOUTHBOUND over PR 10
Built 1971
PR 10 0.5 KM over WATERWAY
Built 1997
RAMP PR10 TO PR14 over BUCANA RIVER
Built 1997
PR 10 KM 3.8 over RIO BUCANA
Built 1997
PR 52 SOUTHBOUND over PR 1
Built 1990
PR 52 NORTHBOUND over PR 1
Built 1990
PR-10 KM 4.55 over PR-14 KM 4.10
Built 2003
PR 14 over DITCH
Built 2006
Bridge Details
- Structure #
- 010682
- Year Built
- 1971
- Length
- 31.3 m (102.7 ft)
- Max Span
- 30 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 32,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $706,000
- Total Project Cost
- $883,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.