PR 52 SOUTHBOUND over LOCAL ROAD
2.5 KM EAST OF PONCE · County 113, Puerto Rico · Built 1995 · 3 Lanes · 50,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.001747, -66.583792
This bridge is in worse condition than 27.4% of bridges in County 113. The average bridge in Puerto Rico is 0 years old; this one is 31 years old.
Nearby Bridges
PR 52 NORTHBOUND over LOCAL ROAD
Built 1995
PR 52 NORTHBOUND over PR 1
Built 1990
PR 52 SOUTHBOUND over PR 1
Built 1990
PR 1 KM 125.0 over BUCANA RIVER
Built 1975
PR 52 102.3 KM over DIRT ROAD
Built 1995
PR 2 over PORTUGUES RIVER
Built 1978
PR 10 0.5 KM over WATERWAY
Built 1997
PR 52 over DIRT ROAD
Built 1995
PR 12 4.5 KM over PR 1 AND PR 133 126.8 KM
Built 1996
CAMPOS STREET over PORTUGUES RIVER
Built 1986
Bridge Details
- Structure #
- 023702
- Year Built
- 1995
- Length
- 29.6 m (97.1 ft)
- Max Span
- 28.1 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 3
- Daily Traffic
- 50,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.