PR 2 192.2 KM over CREEK

4 KM NORTHWEST OF GUANICA · County 055, Puerto Rico · Built 1979 · 4 Lanes · 29,800 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
016681
Year Built
1979
Length
13 m (42.7 ft)
Max Span
4.2 m
Width
40.7 m (133.5 ft)
Lanes
4
Daily Traffic
29,800
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,032,000
Total Project Cost
$1,238,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.