PR 2 187.4 KM over FUTURE ROAD & CHANNE

5 KMS SE OF SABANA GRANDE · County 055, Puerto Rico · Built 1979 · 4 Lanes · 24,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016611
Year Built
1979
Length
36.6 m (120.1 ft)
Max Span
35.4 m
Width
28.5 m (93.5 ft)
Lanes
4
Daily Traffic
24,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,460,000
Total Project Cost
$263,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.