PR 391 6.1 KM over LOS JOBOS RIVER

BO. RUSIO OF PE¥UELA · County 111, Puerto Rico · Built 1955 · 2 Lanes · 7,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
012931
Year Built
1955
Length
12 m (39.4 ft)
Max Span
10.3 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
7,200
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.