CALLE 7 0.4 KM over QUEBRADA CEIBA

_ · County 111, Puerto Rico · Built 2019 · 2 Lanes · 900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
030911
Year Built
2019
Length
16.8 m (55.1 ft)
Max Span
15.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
900
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.