PR 123 16.8 KM over WATERWAY

10 KM NORTHWEST OF PONCE · County 113, Puerto Rico · Built 1900 · 2 Lanes · 3,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
012131
Year Built
1900
Length
6.8 m (22.3 ft)
Max Span
6.8 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
3,500
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$152,000
Total Project Cost
$182,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.