PR 184 28.2 KM over GUAVATE CREEK
9 KM NORTH EAST OF CAYEY · County 035, Puerto Rico · Built 1968 · 2 Lanes · 1,800 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
18.131389, -66.071778
This bridge is in worse condition than 24.4% of bridges in County 035. The average bridge in Puerto Rico is 0 years old; this one is 58 years old.
Nearby Bridges
PR 184 29.8 KM over SANTANA CREEK
Built 1900
PR 743 4.15 KM over WATERWAY
Built 1969
PR 7765 0.1 KM over SAN SALVADOR CREEK
Built 1971
PR 52 NORTHBOUND over PR 7786
Built 1972
PR 52 SOUB 31.5 KM over PR 7786 0.4 KM
Built 1972
PR 52 NORTHBOUND over PR 184
Built 1972
PR 52 SOUTHBOUND over PR 184
Built 1972
PR 52 SOUTHBOUND over RURAL LOCAL
Built 1971
PR 184 33.3 KM over BEATRIZ CREEK
Built 1969
PR-7736 0.1 KM over PLATA CREEK
Built 2003
Bridge Details
- Structure #
- 011291
- Year Built
- 1968
- Length
- 7.6 m (24.9 ft)
- Max Span
- 3.7 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,800
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $48,000
- Total Project Cost
- $72,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.