PR 743 4.15 KM over WATERWAY

8 MILES N E OF CAYEY · County 035, Puerto Rico · Built 1969 · 2 Lanes · 2,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
010631
Year Built
1969
Length
25.2 m (82.7 ft)
Max Span
9.4 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
2,900
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$333,000
Total Project Cost
$399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.