PR 52 SOUB 31.5 KM over PR 7786 0.4 KM

5 KM NORTH EAST OF CAYEY · County 035, Puerto Rico · Built 1972 · 2 Lanes · 91,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
012812
Year Built
1972
Length
30.2 m (99.1 ft)
Max Span
28.8 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
91,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$686,000
Total Project Cost
$858,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.