RAMP B NORTHBOUND over PROPOSED SUBWAY TUNNEL
BROAD STR.INTERCH.3700B07 · County 101, Pennsylvania · Built 1975 · 1 Lanes · 9,283 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.898889, -75.173889
This bridge is in worse condition than 53.2% of bridges in County 101. The average bridge in Pennsylvania is 0 years old; this one is 51 years old.
Nearby Bridges
RAMP B N.B.ON over FUTURE SUBWAY EXTENSION
Built 1969
Broad Street over CONRAIL B&O RR BELT LINE
Built 1917
DELAWARE EXPWAY. over TERMINAL AVE;RR SIDINGS;
Built 1972
RAMP D S.B. OFF over FUTURE SUBWAY EXTENSION
Built 1969
BROAD STREET S.B. over I-95 RAMP A & RAMP C
Built 1969
RAMP A N.B. OFF over OPEN FIELD EARTH FILL
Built 1969
RAMP C (SB) ON over OPEN FIELD
Built 1969
INTERSTATE 95 over BROAD ST.NB&SBI-95RAMP A
Built 1973
RAMP D S.B. OFF over TERMINAL AVENUE
Built 1969
FDR Park Center Dr over FDR Park Lake
Built 1915
Bridge Details
- Structure #
- 000000000039308
- Year Built
- 1975
- Length
- 25 m (82 ft)
- Max Span
- 24.4 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 1
- Daily Traffic
- 9,283
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,000
- Total Project Cost
- $86,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.