TYBURN ROAD over NEWBOLD ROAD

1MI.SE.MORRISVILLE 39A09 · County 017, Pennsylvania · Built 1954 · 2 Lanes · 11,568 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000007185
Year Built
1954
Reconstructed
2011
Length
35.1 m (115.2 ft)
Max Span
15.5 m
Width
21.8 m (71.5 ft)
Lanes
2
Daily Traffic
11,568
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$129,000
Total Project Cost
$1,745,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.