TRAFFIC ROUTE 13 over NEWBOLD ROAD & Conrail

1MI.S.MORRISVILL 38J07 · County 017, Pennsylvania · Built 1954 · 2 Lanes · 22,071 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006774
Year Built
1954
Reconstructed
2003
Length
191.4 m (628 ft)
Max Span
38.1 m
Width
20.3 m (66.6 ft)
Lanes
2
Daily Traffic
22,071
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$67,000
Total Project Cost
$905,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.