U.S. ROUTE 13 over TYBURN ROAD

2MI.S.MORRISVILL 38H09 · County 017, Pennsylvania · Built 1954 · 2 Lanes · 24,470 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006773
Year Built
1954
Reconstructed
2005
Length
45.1 m (148 ft)
Max Span
22.9 m
Width
23.6 m (77.4 ft)
Lanes
2
Daily Traffic
24,470
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$149,000
Total Project Cost
$2,012,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.