MISSION ST over SOUTH 21ST STREET
061 MISSION ST WEST · County 003, Pennsylvania · Built 1939 · 2 Lanes · 650 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
40.423583, -79.976694
This bridge is in worse condition than 91.2% of bridges in County 003. The average bridge in Pennsylvania is 0 years old; this one is 87 years old.
Nearby Bridges
MISSION ST over GOMER AND GREELY STREETS
Built 1939
SOUTH TWELFTH ST over NORFOLK SOUTHERN RR
Built 1901
SR 885 over BLUFF
Built 2007
SR 885 over BLUFF
Built 2001
BIRMINGHAM BRIDGE over MON RIVER CSX RR
Built 1976
PARKWAY EAST over BRADDOCK AVE
Built 1951
RAMP E 8010 EB over BRADDOCK AVENUE
Built 1952
S 27th Street over CSX Railroad Tunnel
Built 2002
S 28th Street over CSX Railroad Tunnel
Built 2002
RAMP F over RAMP C&D FT.PITT BLVD.
Built 1956
Bridge Details
- Structure #
- 000000000002428
- Year Built
- 1939
- Reconstructed
- 1982
- Length
- 120.1 m (394 ft)
- Max Span
- 48.8 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 650
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $56,000
- Total Project Cost
- $755,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.