MISSION ST over GOMER AND GREELY STREETS
060 MISSION ST EAST · County 003, Pennsylvania · Built 1939 · 2 Lanes · 650 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
40.423239, -79.974397
This bridge is in worse condition than 91.2% of bridges in County 003. The average bridge in Pennsylvania is 0 years old; this one is 87 years old.
Nearby Bridges
MISSION ST over SOUTH 21ST STREET
Built 1939
SOUTH TWELFTH ST over NORFOLK SOUTHERN RR
Built 1901
RAMP E 8010 EB over BRADDOCK AVENUE
Built 1952
PARKWAY EAST over BRADDOCK AVE
Built 1951
SR 885 over BLUFF
Built 2007
S 27th Street over CSX Railroad Tunnel
Built 2002
BIRMINGHAM BRIDGE over MON RIVER CSX RR
Built 1976
S 28th Street over CSX Railroad Tunnel
Built 2002
SR 885 over BLUFF
Built 2001
HOT METAL STREET over CSX RAILROAD TUNNEL
Built 2000
Bridge Details
- Structure #
- 000000000002427
- Year Built
- 1939
- Reconstructed
- 1982
- Length
- 68.6 m (225.1 ft)
- Max Span
- 28.3 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 650
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $32,000
- Total Project Cost
- $432,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.