RAMP F over RAMP C&D FT.PITT BLVD.

RAMP F TO PARKWAY EAST · County 003, Pennsylvania · Built 1956 · 1 Lanes · 1,427 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002910
Year Built
1956
Reconstructed
2013
Length
163.7 m (537.1 ft)
Max Span
23.5 m
Width
8.8 m (28.9 ft)
Lanes
1
Daily Traffic
1,427
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$140,000
Total Project Cost
$1,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.