PARKWAY EAST over RAMP A WB
376 OVER WB RAMP A · County 003, Pennsylvania · Built 1961 · 6 Lanes · 73,349 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.440403, -79.833803
This bridge is in worse condition than 38% of bridges in County 003. The average bridge in Pennsylvania is 0 years old; this one is 65 years old.
Nearby Bridges
PENN LINCOLN PY over RODI ROAD NB&SB
Built 1962
RAMP D over RODI RD NB
Built 1962
PARKWAY EAST over SR 2110 SH
Built 1950
I-376 over SUNSET DRIVE
Built 1962
WILLIAM PENN HY over LR 395 & CHALFONT RUN
Built 1941
PARKWAY EAST over BEULAH ROAD
Built 1950
SOUTH BEND LANE over CHALFONT RUN
Built 2020
JEFFERSON-HTS RD over LR 187 PAR-I 376
Built 1962
GREENSBURG PIKE over SR 0376 EB WB
Built 1955
RODI ROAD over CHALFONT RUN
Built 1967
Bridge Details
- Structure #
- 000000000001197
- Year Built
- 1961
- Reconstructed
- 1976
- Length
- 23.8 m (78.1 ft)
- Max Span
- 22.9 m
- Width
- 27 m (88.6 ft)
- Lanes
- 6
- Daily Traffic
- 73,349
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $22,000
- Total Project Cost
- $299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.