PARKWAY EAST over BEULAH ROAD
CHURCHILL INTERCHANGE · County 003, Pennsylvania · Built 1950 · 4 Lanes · 69,636 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.445306, -79.848403
This bridge is in worse condition than 38% of bridges in County 003. The average bridge in Pennsylvania is 0 years old; this one is 76 years old.
Nearby Bridges
PARKWAY EAST over SR 2110 SH
Built 1950
GREENSBURG PIKE over SR 0376 EB WB
Built 1955
PARKWAY EAST over RAMP A WB
Built 1961
PENN LINCOLN PY over RODI ROAD NB&SB
Built 1962
RAMP D over RODI RD NB
Built 1962
RAMP A over RAMP F
Built 1952
RAMP A over ARDMORE BLVD SR 0008
Built 1952
PENN LINCOLN PY over SR 8012-RAMP A
Built 1950
RAMP D over ARDMORE BLVD.
Built 1952
I376 over ARDMORE BLVD.
Built 1951
Bridge Details
- Structure #
- 000000000001189
- Year Built
- 1950
- Reconstructed
- 2008
- Length
- 53.6 m (175.9 ft)
- Max Span
- 18.3 m
- Width
- 23.8 m (78.1 ft)
- Lanes
- 4
- Daily Traffic
- 69,636
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $24,000
- Total Project Cost
- $321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.