RAMP D over ARDMORE BLVD.

RP D EB OVER ARDMORE BLVD · County 003, Pennsylvania · Built 1952 · 1 Lanes · 6,502 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002771
Year Built
1952
Reconstructed
2008
Length
42.1 m (138.1 ft)
Max Span
40.2 m
Width
10.2 m (33.5 ft)
Lanes
1
Daily Traffic
6,502
Material
Steel
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$32,000
Total Project Cost
$431,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.