WILLIAM PENN HY over LR 395 & CHALFONT RUN

OVER SR 2053 · County 003, Pennsylvania · Built 1941 · 4 Lanes · 22,920 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001574
Year Built
1941
Reconstructed
2024
Length
81.1 m (266.1 ft)
Max Span
32.6 m
Width
22.3 m (73.2 ft)
Lanes
4
Daily Traffic
22,920
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$91,000
Total Project Cost
$1,225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.