INTERSTATE 376 WB over ABDN RR 2ND AVE 10TH ST

1/4 MI. E.OF LIBERTY BR. · County 003, Pennsylvania · Built 1956 · 3 Lanes · 37,791 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001133
Year Built
1956
Reconstructed
1985
Length
533.4 m (1750 ft)
Max Span
54.9 m
Width
14.2 m (46.6 ft)
Lanes
3
Daily Traffic
37,791
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$149,000
Total Project Cost
$2,012,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.