RAMP K over CROSSTOWN BLVD

RP. FROM BLVD.TO SR579 NB · County 003, Pennsylvania · Built 1962 · 1 Lanes · 15,599 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002733
Year Built
1962
Reconstructed
2012
Length
297.5 m (976 ft)
Max Span
38.1 m
Width
7.5 m (24.6 ft)
Lanes
1
Daily Traffic
15,599
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$203,000
Total Project Cost
$2,742,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.