RAMP G over CROSSTOWN BLVD

NORTH OF LIBERTY BR. · County 003, Pennsylvania · Built 1962 · 1 Lanes · 6,042 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002731
Year Built
1962
Reconstructed
2012
Length
179.2 m (587.9 ft)
Max Span
28 m
Width
8.7 m (28.5 ft)
Lanes
1
Daily Traffic
6,042
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$103,000
Total Project Cost
$1,386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.