13TH ST EAST over SHELTON DITCH

PARALLEL TO 470414 · County 047, Oregon · Built 1975 · 1 Lanes · 19,501 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
470415000 00000
Year Built
1975
Length
33.8 m (110.9 ft)
Max Span
23.2 m
Width
11.4 m (37.4 ft)
Lanes
1
Daily Traffic
19,501
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$371,000
Total Project Cost
$594,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.