13TH ST WEST over SHELTON DITCH

13TH AND LESLIE ST · County 047, Oregon · Built 1988 · 1 Lanes · 13,876 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
470414000
Year Built
1988
Length
62.8 m (206 ft)
Max Span
33.5 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
13,876
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$653,000
Total Project Cost
$1,045,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.