Hwy 72 EB On Ramp over 13th St. & UPRR
CITY OF SALEM · County 047, Oregon · Built 1988 · 1 Lanes · 17,817 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.930847, -123.028533
This bridge is in worse condition than 25.9% of bridges in County 047. The average bridge in Oregon is 0 years old; this one is 38 years old.
Nearby Bridges
13TH ST EAST over SHELTON DITCH
Built 1975
13TH ST WEST over SHELTON DITCH
Built 1988
OR 22 (Hwy 72) over 13th Street
Built 1988
Hwy 72 WB Off Ramp over 13th & Shelton Ditch
Built 1988
14TH ST SE over SHELTON DITCH
Built 1962
Mission St On Ramp over Bike Path
Built 1988
Hwy 72 (12th St) over Shelton Ditch
Built 1929
HWY 72 (OR 22) over 14th St. & UPRR
Built 1988
MISSION ST over PRINGLE CREEK
Built 1953
17TH ST SE over SHELTON DITCH
Built 1987
Bridge Details
- Structure #
- 16812E072 00645
- Year Built
- 1988
- Length
- 327.7 m (1075.1 ft)
- Max Span
- 43.6 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 1
- Daily Traffic
- 17,817
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,245,000
- Total Project Cost
- $5,192,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.