INDUSTRIAL WAY over SANTIAM-ALBANY CANAL

001 MI S HWY22 · County 043, Oregon · Built 1987 · 2 Lanes · 443 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
43B120000000000
Year Built
1987
Length
15.5 m (50.9 ft)
Max Span
15.2 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
443
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$212,000
Total Project Cost
$340,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.