US 20 (Hwy 16) over Mt. States Power Canal

006 MI NW LEBANON · County 043, Oregon · Built 1950 · 2 Lanes · 10,847 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01162A016 01189
Year Built
1950
Length
28.3 m (92.8 ft)
Max Span
9.4 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
10,847
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$298,000
Total Project Cost
$476,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.