WHEELER STREET over ALBANY SANTIAM CANAL
E LEBANON CITY LIMITS. · County 043, Oregon · Built 1958 · 2 Lanes · 850 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
8
Very Good
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
44.545981, -122.899181
This bridge is in worse condition than 83.3% of bridges in County 043. The average bridge in Oregon is 0 years old; this one is 68 years old.
Nearby Bridges
NORTH WILLIAMS ST over ALBANY-SANTIAM CANAL
Built 1967
INDUSTRIAL WAY over SANTIAM-ALBANY CANAL
Built 1987
ASH ST over SANTIAM-ALBANY CANAL
Built 1972
HIATT STREET over ALBANY-SANTIAM CANAL
Built 1970
TENNESSEE RD over SMALL CREEK
Built 1964
E.GRANT STREET over ALBANY-SANTIAM CANAL
Built 1963
WILLIAMS STREET over ALBANY-SANTIAM CANAL
Built 1961
GROVE STREET over SANTIAM-ALBANY CANAL
Built 1973
GRANT STREET over SOUTH SANTIAM RIVER
Built 2008
OAK ST over SANTIAM-ALBANY CANAL
Built 1968
Bridge Details
- Structure #
- 12673 070200004
- Year Built
- 1958
- Length
- 29.3 m (96.1 ft)
- Max Span
- 5.8 m
- Width
- 9 m (29.5 ft)
- Lanes
- 2
- Daily Traffic
- 850
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $399,000
- Total Project Cost
- $639,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.