MATNEY WAY over IRRIGATION CANAL

AT G CANAL & HILL RO · County 035, Oregon · Built 1970 · 2 Lanes · 111 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
35C212090400100
Year Built
1970
Length
14 m (45.9 ft)
Max Span
13.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
111
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.