MATNEY ROAD over IRRIGATION CANAL
004 MI S OF OCONNOR ROAD · County 035, Oregon · Built 1969 · 2 Lanes · 96 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
42.084564, -121.698367
This bridge is in worse condition than 80.6% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 57 years old.
Nearby Bridges
MATNEY WAY over IRRIGATION CANAL
Built 1970
OCONNOR ROAD over IRRIGATION CANAL
Built 1966
CHEYNE RD over IRRIGATION CANAL
Built 1974
MATNEY WAY over LOST RIVER
Built 1974
DEHLINGER ROAD over LOST RIVER
Built 1975
MATNEY WAY over IRRIGATION CANAL
Built 1970
CROSS ROAD over IRRIGATION CANAL C
Built 1977
DEHLINGER LANE over IRRIGATION CANAL
Built 1968
CHIN ROAD over IRRIGATION CANAL
Built 1985
HOMEDALE RD over IRRIGATION CANAL
Built 1963
Bridge Details
- Structure #
- 35C157088900140
- Year Built
- 1969
- Length
- 11.3 m (37.1 ft)
- Max Span
- 11 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 96
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.