CHIN ROAD over IRRIGATION CANAL

004 MI S OF HWY 39 · County 035, Oregon · Built 1985 · 2 Lanes · 92 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
35C113097900040
Year Built
1985
Length
11.3 m (37.1 ft)
Max Span
11 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
92
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.