NE 21ST AVE over B-8 OVER COLUMBIA SLOUGH

21ST-N OF COLUMBIA BLVD · County 051, Oregon · Built 1974 · 2 Lanes · 1,416 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
25B08 000
Year Built
1974
Length
39.3 m (128.9 ft)
Max Span
12.8 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
1,416
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$455,000
Total Project Cost
$728,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.