NE 33RD AVE RAMP over B-9A X NE COLUMBIA BLVD
1 BLOCK N OF DEKUM ST · County 051, Oregon · Built 1967 · 1 Lanes · 5,161 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.572503, -122.630647
This bridge is in worse condition than 74.6% of bridges in County 051. The average bridge in Oregon is 0 years old; this one is 59 years old.
Nearby Bridges
NE 33rd Ave over B-9 Over NE Lombard
Built 2006
NE 33RD AVE over B-9 OVER UPRR
Built 1929
COLUMBIA BLVD over B-103 X NE 33RD AVE
Built 1963
NE 33rd Ave over B-174XCol Slough
Built 2006
NE 42ND AVE over B-75 X LOMBARD AND UPRR
Built 1938
NE 47TH AVE over B-161 X WHITAKER SLOUGH
Built 2001
NE 47TH AVE over B-93 X COLUMBIA SLOUGH
Built 1991
NE 21ST AVE over B-8 OVER COLUMBIA SLOUGH
Built 1974
NE 21ST AVE over Elrod Slough
Built 2014
DOWTY ROAD over EAGLE CREEK
Built 2000
Bridge Details
- Structure #
- 02484A000 00014
- Year Built
- 1967
- Length
- 161.5 m (529.9 ft)
- Max Span
- 17.1 m
- Width
- 6.7 m (22 ft)
- Lanes
- 1
- Daily Traffic
- 5,161
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,210,000
- Total Project Cost
- $1,936,000