NE 21ST AVE over Elrod Slough
21ST-N of NE Riverside W. · County 051, Oregon · Built 2014 · 2 Lanes · 1,416 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
45.58235, -122.643153
This bridge is in worse condition than 1.3% of bridges in County 051. The average bridge in Oregon is 0 years old; this one is 12 years old.
Nearby Bridges
NE 21ST AVE over B-8 OVER COLUMBIA SLOUGH
Built 1974
NE 33rd Ave over B-174XCol Slough
Built 2006
NE SUNDERLAND ROAD over B-94 X DRAINAGE DITCH
Built 1970
NE CLAREMONT ST over B-5 X WOODLAWN PARK PATH
Built 1974
COLUMBIA BLVD over B-103 X NE 33RD AVE
Built 1963
NE 33RD AVE over B-9 OVER UPRR
Built 1929
Hwy 081 over UPRR
Built 1916
NE 33RD AVE RAMP over B-9A X NE COLUMBIA BLVD
Built 1967
NE 33rd Ave over B-9 Over NE Lombard
Built 2006
Hwy 081 over Columbia Slough
Built 1934
Bridge Details
- Structure #
- 22024 000 00000
- Year Built
- 2014
- Length
- 23.1 m (75.8 ft)
- Max Span
- 22.5 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,416
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $455,000
- Total Project Cost
- $728,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.