GASTON ROAD over WAPATO CREEK

0075 MI E GASTON · County 067, Oregon · Built 2021 · 2 Lanes · 2,057 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
23952A067600051
Year Built
2021
Length
25.3 m (83 ft)
Max Span
25.3 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
2,057
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.