Hwy 29 over Creek

1.0 MI N GASTON PO · County 067, Oregon · Built 1967 · 2 Lanes · 10,697 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
09496 029 02459
Year Built
1967
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
10,697
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.