Hwy 29 over Tualatin River

0.2 MI N GASTON PO · County 067, Oregon · Built 1967 · 2 Lanes · 10,942 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00810A029 02532
Year Built
1967
Length
38.1 m (125 ft)
Max Span
13.7 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
10,942
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.