OR62 (HWY 022BD) over OR62 Conn I (HWY 022I)

Hwy 022BD MP 1.83 · County 029, Oregon · Built 2018 · 2 Lanes · 537 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
21631022BD00183
Year Built
2018
Length
31.1 m (102 ft)
Max Span
31.1 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
537
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.