OR 62 (HWY 022) over I-5 (HWY 001)
JCT I-5 & CRATER LAKE HWY · County 029, Oregon · Built 1961 · 6 Lanes · 36,121 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.350217, -122.876522
This bridge is in worse condition than 12.7% of bridges in County 029. The average bridge in Oregon is 0 years old; this one is 65 years old.
Nearby Bridges
CENTRAL PT RD CON2 over I-5 (HWY 001)
Built 1961
OR 62 (HWY 022) over BEAR CREEK
Built 1961
OR 62 (HWY 022) over BIDDLE RD
Built 1967
I-5 (HWY 001) SB over BEAR CR
Built 1961
I-5 (HWY 001) NB over BEAR CR
Built 1961
I-5 (HWY 001) over GRIFFIN CREEK
Built 1961
CITY STREET 19T11 over MC ANDREWS ST. @ BEAR CR
Built 2005
I-5 (HWY 001) over MCANDREWS RD
Built 1961
OR 238 (HWY 272) over CORP
Built 2002
OR62 (HWY 022BD) over OR62 Conn I (HWY 022I)
Built 2018
Bridge Details
- Structure #
- 08821 022 00047
- Year Built
- 1961
- Reconstructed
- 2001
- Length
- 73.2 m (240.2 ft)
- Max Span
- 19.3 m
- Width
- 33.2 m (108.9 ft)
- Lanes
- 6
- Daily Traffic
- 36,121
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,707,000
- Total Project Cost
- $4,332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.