CENTRAL PT RD CON2 over I-5 (HWY 001)
2.5 MI N OF CRATER LK HWY · County 029, Oregon · Built 1961 · 4 Lanes · 697 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.350356, -122.876544
This bridge is in worse condition than 45.4% of bridges in County 029. The average bridge in Oregon is 0 years old; this one is 65 years old.
Nearby Bridges
OR 62 (HWY 022) over I-5 (HWY 001)
Built 1961
OR 62 (HWY 022) over BIDDLE RD
Built 1967
OR 62 (HWY 022) over BEAR CREEK
Built 1961
I-5 (HWY 001) SB over BEAR CR
Built 1961
I-5 (HWY 001) NB over BEAR CR
Built 1961
I-5 (HWY 001) over GRIFFIN CREEK
Built 1961
CITY STREET 19T11 over MC ANDREWS ST. @ BEAR CR
Built 2005
I-5 (HWY 001) over MCANDREWS RD
Built 1961
OR 238 (HWY 272) over CORP
Built 2002
OR62 (HWY 022BD) over OR62 Conn I (HWY 022I)
Built 2018
Bridge Details
- Structure #
- 08542 001C03275
- Year Built
- 1961
- Length
- 109.5 m (359.3 ft)
- Max Span
- 24.4 m
- Width
- 25.3 m (83 ft)
- Lanes
- 4
- Daily Traffic
- 697
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.