US 26 (HWY 005) over JOHN DAY RIVER (COLES)

00.65 MI W JCT US 395 · County 023, Oregon · Built 2010 · 2 Lanes · 2,849 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20870 005 15575
Year Built
2010
Length
51.8 m (169.9 ft)
Max Span
20.7 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
2,849
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.