US 26 (HWY 005) over BEECH CR(MT VERNON)

001 MI E JCT US 395 · County 023, Oregon · Built 1956 · 2 Lanes · 2,836 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
01041 005 15407
Year Built
1956
Length
23.2 m (76.1 ft)
Max Span
5.8 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
2,836
Material
Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.